Deking   Installation

Deking   Installation

Decking Installation Guide


Step 1:
Drill joist onto the subfloor drill down screw onto the joist

Step 2:
Keep joist approximately 12-16 inches apart
Keep every screw on the joist approximately 12 inches apart from each other

Step 3:
Attach starter clip at the end of every joist with a screw

Step 4:
Slide the first decking board firmly against the starter clip

Step 5:
Attach the metal clip onto the opposite side of the decking board, insert and fasten the screw on the metal clip on the joist.

Step 6:
Slip the next decking board firmly up to metal clip.

Step 7:
Finish your decking with edge cover

Step 1:

Drill joist onto the subfloor drill down screw onto the joist

Step 2:
Keep joist approximately 12-16 inches apart
Keep every screw on the joist approximately 12 inches apart from each other

Step 3:
Attach starter clip at the end of every joist with a screw

Step 4:
Slide the first decking board firmly against the starter clip

Step 5:
Attach the metal clip onto the opposite side of the decking board, insert and fasten the screw on the metal clip on the joist.

Step 6:
Slip the next decking board firmly up to metal clip.

Step 7:
Finish your decking with edge cover